HTML Preview Daily Inspection Report page number 1.


Page 1 of 2
(Rev. 09/2013)
DAILY INSPECTION REPORT
Date:
Contract ID:
Temperature
High
Weather Conditions:
Low
Rainfall Total:
Description of work & inspection: (use additional sheet if necessary)
Contractor/Subcontractor Active Contractor/Subcontractor Active
QC Inspector:
Signature:
(Report Installed Quantities and Tests on Page 2)
DOWNLOAD HERE


Winners take time to relish their work, knowing that scaling the mountain is what makes the view from the top so exhilarating. | Denis Waitley