HTML Preview Daily Inspection Report page number 1.


Page 1 of 2
(Rev. 09/2013)
DAILY INSPECTION REPORT
Date:
Contract ID:
Temperature
High
Weather Conditions:
Low
Rainfall Total:
Description of work & inspection: (use additional sheet if necessary)
Contractor/Subcontractor Active Contractor/Subcontractor Active
QC Inspector:
Signature:
(Report Installed Quantities and Tests on Page 2)
DOWNLOAD HERE


Whatever the mind of man can conceive and believe, it can achieve. Thoughts are things! And powerful things at that, when mixed with definiteness of purpose, and burning desire, can be translated into riches. | Napoleon Hill