HTML Preview House Construction Format page number 1.


SAMPLE QUOTE FROM:
JOE THE BUILDER
PRICE QUOTE FOR: Steve & Jackie Homeowner
TO BE LOCATED AT: Lot X, Noplace Subdivision
Sometown, US
Description
Amount
Permits
$1,061.00
Excavation
$4,000.00
Septic System (Allowance)
$5,500.00
Termite Pre-treatment
$541.00
Concrete
$39,255.00
Gravel Driveway
$1,600.00
Framing
$58,266.00
Exterior Doors & Windows
$23,213.00
Fireplace
$2,400.00
Brick
$26,253.00
Cultured Stone
$975.00
Siding, Soffit, Gutters & Gutter Guards
$10,525.00
Plumbing
$8,170.00
Plumbing Fixtures (Allowance)
$5,897.00
Heating & Cooling
$15,655.00
Electric
$13,202.00
Electronics (Satellite, Antenna, Phone)
$2,134.00
Security System
$2,511.00
Lighting (Allowance)
$3,500.00
Mirrors & Accessories (Allowance)
$800.00
Insulation
$4,646.00
Drywall
$16,013.00
Paint
$12,292.00
Interior Trim & Doors
$17,338.00
Cabinets (Allowance)
$20,000.00
Carpet (Allowance)
$4,368.00
Ceramic Tile (Allowance)
$5,255.00
Hardwood (Allowance)
$8,192.00
Porch Columns & Posts
$1,147.00
Seed & Straw Yard (1 Acre Allowance)
$2,500.00
Clean, Clean up, Dump Runs & Final
$2,854.00
Subtotal
$320,063.00
Contractor's Fee
$32,006.30
Total
$352,069.30
PDF created with pdfFactory Pro trial version www.pdffactory.com
DOWNLOAD HERE


We generate fears while we sit. We over come them by action. Fear is natures way of warning us to get busy. | Dr. Henry Link