HTML Preview Data Asset Inventory page number 1.


Asset Knowledge
& Management
CSC & Fault
Reporting
Forward Work
Programme
Deterioration
Modelling
BVPI’s
Contract
Management
Valuation
Field/Office
Programme
or Ad Hoc
Carriageway Inventory
Section Id O
Section name O
Road name  O
Start point  O
End point O
Length  FP
GIS geometry O
XSP  FP
Lane width  FP
Step level  FP
Surfacing  FP
Surf. layer depth FA
Surface dates  O
Pavement  FP
Pavement layer
depth FA
Pavement dates  O
Maintenance
category O
Salting route  O
Classification O
Owner  O
Parish  O
Speed O
Condition records
CVI 
Scrim 
Ground radar 
Deflectrograph 
• Other dates should be recorded, depending on CONFIRM functions
Inventory
Attribute
Condition Records
271
Appendix C – Asset Inventory and Condition Data
STAMP QMS controlled documentation March 2005 TS-30-01
C
DOWNLOAD HERE


Success in business requires training and discipline and hard work. But if you’re not frightened by these things, the opportunities are just as great today as they ever were. | David Rockefeller