Date Completed _________________ Completed by ______________
Component to Inspect/Test Action Comments
Fue
   Main supply tank level
   Day tank level
   Day tank float switch
   Supply or transfer pump operation
   Solenoid valve operation
   Water in fuel system
   Flexible fuel hoses and connectors
Lubrication S
stem
   Oil level
   Lube oil heate
Coolin
 S
stem
   Level
   Adequate cooling water to the heat exchanger
   Adequate fresh air through the radiator
   Water pump(s)
   Condition of flexible hoses and connection
   Jacket water heater
Exhaust S
stem
   Leakage
   Drain condensate traps
Battery System
   Electrolyte levels
Electrical S
stem
   General inspection
Prime Mover and Generato
   General inspection
General condition of EPSS, any unusual condition
Service room or housing housekeeping
ction Codes     
¥        Inspected, no problems noted
C       Problem identified and corrected
F       Problem identified that could not be immediately corrected. Interim measures initiated as needed.
NA    Not Applicable
Adapted from 2005 Edition of NFPA 110 Figure A 8.3.1(a), "Suggested Maintenance Schedule for Emergency Power 
   Supply Systems"
Generator Weekly Inspection Checklist
Generator Number _______________
SAMPLE