HTML Preview Weekly Inspection Checklist page number 1.


Date Completed _________________ Completed by ______________
Component to Inspect/Test Action Comments
Fue
l
Main supply tank level
Day tank level
Day tank float switch
Supply or transfer pump operation
Solenoid valve operation
Water in fuel system
Flexible fuel hoses and connectors
Lubrication S
y
stem
Oil level
Lube oil heate
r
Coolin
g
S
y
stem
Level
Adequate cooling water to the heat exchanger
Adequate fresh air through the radiator
Water pump(s)
Condition of flexible hoses and connection
Jacket water heater
Exhaust S
y
stem
Leakage
Drain condensate traps
Battery System
Electrolyte levels
Electrical S
y
stem
General inspection
Prime Mover and Generato
r
General inspection
General condition of EPSS, any unusual condition
Service room or housing housekeeping
A
ction Codes
¥ Inspected, no problems noted
C Problem identified and corrected
F Problem identified that could not be immediately corrected. Interim measures initiated as needed.
NA Not Applicable
Adapted from 2005 Edition of NFPA 110 Figure A 8.3.1(a), "Suggested Maintenance Schedule for Emergency Power
Supply Systems"
Generator Weekly Inspection Checklist
Generator Number _______________
SAMPLE


Work expands so as to fill the time available for its completion. | Cyril Northcote Parkinson/Parkinson’s Law.